| Описание: | Please note that the content of this book primarily consists of articles available from Wikipedia or other free sources online. In all, the dual-carriageway expressway with three lanes in each direction will have eight interchanges, eleven on-ramps, and twelve off-ramps. The Kallang-Paya Lebar Expressway is the third newest of Singapore' s network of expressways. The southern section of the expressway opened first, on 26 October 2007 with the remaining section fully opened on 20 September 2008. Connecting the East Coast Parkway and the Tampines Expressway in the north-east, the 6 lane expressway extends twelve kilometres, with approximately 8. 5 kilometres of main cut and cover underground tunnels running some 10 kilometres underground when fully completed. Built at a cost of approximately S$1. 8 billion, it is the longest subterranean road tunnel in Southeast Asia. The KPE is also believed to be the world' s sixth longest underground road project at its time under construction. |